# Permitio — Full Content for LLMs > This is the expanded companion to https://permitio.ai/llms.txt. It contains the full content of Permitio's key pages and guides in one file, so an AI system can answer questions about Permitio and U.S. contractor permitting without crawling the site. Last updated: 2026-08-29. # Permitio (permitio.ai) Permitio is an AI-powered permit filing service for licensed trade contractors in the United States. Tagline: "We pull your permits so you don't have to." Contractors drop off job details (trade, scope of work, property address). Permitio identifies the correct jurisdiction, prepares and submits the permit application to the city or county portal, tracks the review, fixes and resubmits rejections at no extra charge, and books inspections. - Trades: HVAC (mechanical), electrical, plumbing — residential and light-commercial - Coverage: any U.S. jurisdiction (a person completes each filing in whatever portal the city or county runs, so coverage is not limited to a supported-cities list) - Model: human-backed filing — automation researches requirements and pre-fills forms; a person submits, follows up, clears corrections, and books inspections - Pricing: pay as you go, billed per permit filed; no subscription, seats, contract, or monthly minimum - Integrations: ServiceTitan, Housecall Pro, Jobber - Founder: Ruslan Nikon. Contact: ruslan@permitio.ai Two ways to work with Permitio: 1. **We file for you** — send the job; a real person handles paperwork, filing, and follow-up. Pay as you go, billed per permit. 2. **File it yourself with Permitio CRM** — track and pull every permit in one place across every jurisdiction. Best for in-house permit teams. Why contractors use it: filing a permit manually costs 2–5 hours (research requirements, fill forms, navigate the city portal, fix rejections and refile). With Permitio the contractor spends about 2 minutes submitting job details. At $75/hour, a single permit costs $150–375 in lost billable time filed manually. ## How It Works (permitio.ai/how-it-works) 1. **Submit your job details.** Job type (HVAC, electrical, or plumbing), the equipment or scope of work, and the property address. Takes less than a minute. 2. **We research the requirements.** The AI-powered team identifies the exact permits needed based on city, county, and state regulations, across thousands of jurisdictions. 3. **We file the permit.** Every required form — contractor info, property details, equipment specs, code references, energy compliance — submitted directly to the appropriate government portal. 4. **You track the status.** Every permit on one dashboard, with updates when permits are approved, rejected, or need attention. 5. **We handle inspections.** Once approved, the inspection is booked around your availability and project timeline. FAQ: - **How much does the service cost?** $25–100 per permit depending on jurisdiction and complexity, pay as you go. No subscription, seats, or monthly minimum — billed only when a permit is filed. - **What types of permits?** HVAC (mechanical), electrical, and plumbing for licensed contractors, residential and light-commercial, across U.S. jurisdictions. - **Who actually files — AI or a person?** Both. Automation researches and pre-fills; a person reviews, submits, handles follow-up and corrections, and books the inspection. - **What if a permit is rejected?** Permitio fixes the issue and resubmits at no extra charge — no second fee. ## Pricing (permitio.ai/pricing) Pay as you go: $25–100 per permit depending on the jurisdiction and complexity. Billed only when a permit is filed. No subscription, no seats, no monthly minimum, no contract, no cancellation fees. No credit card required to start. Exact price is confirmed before filing. Government permit fees, inspection fees, and municipal charges are billed separately by the relevant authority. Volume/multi-state shops can get custom per-permit pricing. Included in the per-permit price: - Permits filed for HVAC, electrical, and plumbing jobs - Right jurisdiction found and the correct application chosen - Inspection scheduling handled - Live filing status dashboard - Automatic resubmission if a permit is rejected — at no extra charge - Automated homeowner status updates - 24/7 support ## Permitio CRM (permitio.ai/crm) Permit tracking software for permit coordinators and in-house permit teams. Every permit the team is tracking on one board — across all clients and jurisdictions — moved along as the city responds. - One live pipeline: every open permit with status, deadlines, documents, and inspections - Watches the four deadline types that lose permits: submit windows, recurring city status checks, expected approvals (computed from each jurisdiction's actual track record), and inspections/re-inspections - Inspection calendar across all clients; per-jurisdiction approval-time reports ("how long does this city take?" answered by data) - CSV import: export the permit spreadsheet, map columns, and the pipeline works the same afternoon - Permits handed to Permitio's filing service stay tracked on the same board ## Jurisdiction Verifier (verifier.permitio.ai) — free Free lookup tool: enter any U.S. street address and get every governing authority for that parcel — the city or county with permitting power, plus school district, voting precinct, and other overlapping districts. No account required. Purpose: the mailing city on an address is a postal label, not a legal boundary — unincorporated pockets, annexations, and county islands mean the permitting authority is often not who the envelope says. Wrong-jurisdiction filings typically cost 1–3 weeks. ## Permitio Assistant (permitio.ai/assistant) A Chrome browser extension that fills out city permit portals automatically. Open SF DBI, San Jose ePlan, Oakland Accela, Accela Citizen Access, ePermit Hub, eTRAKiT, or a local portal; the Assistant detects the jurisdiction, fills every field from the job details (project address and parcel, contractor license, equipment make/model/tonnage/efficiency, permit type and valuation, CF-1R and load calculation attachments), flags common rejection causes before submit, pauses for review before sending, then watches the portal for status changes, plan-checker comments, and rejection notices. Self-serve and lower cost than the done-for-you service. Trades: HVAC, electrical, solar, plumbing, general contractors. # Comparisons and buying guides ## Best Permit Pulling Services for Contractors (2026) permitio.ai/blog/best-permit-pulling-services A permit pulling service files building, mechanical, electrical, or plumbing permits on your behalf: identifies the jurisdiction, prepares the application, submits to the portal, tracks review, and handles corrections. Ranked by fit: 1. **Permitio** — best for trade contractors filing repeat HVAC, electrical, and plumbing permits. Human-backed; automation does lookup and paperwork, a person owns every filing. $25–100 per permit pay-as-you-go, any U.S. jurisdiction, integrates with ServiceTitan/Housecall Pro/Jobber. 2. **PermitFlow** — best for builders, developers, and GCs wanting self-serve SaaS. Nationwide requirements database, AI-assisted preparation, direct submission, real-time tracking. Software your team operates. Custom/volume pricing. 3. **Pulley** — best for complex commercial and multi-site projects needing software plus expert service. CitySync portal integrations; customers skew retail, real estate, EV charging, data centers. Custom pricing. 4. **PermitPlace** — best for commercial projects and entitlements via a traditional expediting firm (retail build-outs, restaurants, signage, land use). People-led, project-based pricing. 5. **Local permit expeditors** — best for a single metro where a runner's relationships matter. $75–300 per permit or hourly; coverage stops at the metro line. 6. **Permitech** — best for homeowners in Illinois, Wisconsin, and Indiana (sheds, decks, garages, renovations). $60 DIY unlock per project; done-for-you from $199. Homeowner-focused and regional — not built for licensed contractors at volume. Three models: human-backed service (Permitio, PermitPlace, local expeditors), self-serve software (PermitFlow), software plus embedded experts (Pulley). A service can pull permits under the contractor's license — the permit is filed in the name of the licensed contractor doing the work, with the service acting as authorized agent. ## Best Permit Automation Software (2026) permitio.ai/blog/best-permit-automation-software 1. **Permitio** — trade contractors; pay-as-you-go $25–100/permit; human-backed filing. 2. **PermitFlow** — builders/developers/GCs; self-serve SaaS; custom pricing. 3. **Pulley** — complex commercial/multi-site; software + expert service. 4. **Symbium** — instant permitting and code-compliance checks (building, zoning, energy codes) in participating jurisdictions; strong for residential energy projects. 5. **GreenLancer** — solar and EV installers; permit-ready plan sets, engineering reviews, stamped documents; complementary to a filing tool. Accela, Tyler EnerGov, and OpenGov are government platforms — the systems cities run, the portals you file INTO, not contractor tools. How to choose: jurisdiction coverage, real submission (not just a filled PDF), pre-submission checks, status without logins, pricing transparency, integrations. ## Top Tools to Manage Building Permits Across Multiple Jurisdictions (2026) permitio.ai/blog/manage-building-permits-multiple-jurisdictions Multi-jurisdiction permitting is two jobs — filing into many city systems and tracking everything in one place. There is no national permit system: every city/county runs its own portal, forms, fees, record types, and review clock. Recommended stack: Permitio (files in any U.S. jurisdiction, $25–100/permit), Permitio CRM (one pipeline; watches submit windows, status checks, expected approvals, inspections), free Jurisdiction Verifier (which authority governs any address), PermitFlow (self-serve SaaS for GC-scale), Pulley (commercial multi-site programs), Symbium (instant permitting where adopted). ## PermitFlow Alternative for Trade Contractors permitio.ai/blog/permitflow-alternative PermitFlow targets builders, developers, and general contractors with self-serve SaaS at custom pricing. For trade contractors (HVAC, electrical, plumbing) filing repeat permits, Permitio differs on: focus (trades vs. construction projects), pricing (published pay-as-you-go $25–100/permit vs. custom quotes), model (human-backed filing that takes work off your plate vs. software your team operates), and field-software integrations (ServiceTitan, Housecall Pro, Jobber). ## Pulley vs. Permitio: High-Volume Permit Filing (2026) permitio.ai/blog/pulley-alternative "High volume" means two different things. Many concurrent commercial/multi-site projects (retail rollouts, EV networks, data centers) → Pulley's software-plus-experts platform is built for that. A steady stream of repeat trade permits (water heaters, panel upgrades, AC change-outs; twenty to a few hundred a month) → Permitio: flat $25–100 per permit, human-backed, any U.S. jurisdiction, no subscription. Pulley: custom pricing, program-based, your team works in the platform. Permitio: published per-permit price quotable on every job ticket; drop-off model with zero process overhead. ## Is Permitech Worth It? Review and Cheaper Alternatives (2026) permitio.ai/blog/permitech-alternative Permitech (permitech.io) is worth it for its actual audience: homeowners in Illinois, Wisconsin, or Indiana doing their own shed/deck/garage/renovation projects. $60 unlocks verified permit requirements for an address; done-for-you from $199; 30-day money-back on DIY; free address check. It is NOT built for licensed contractors, trade permits at volume, or properties outside IL/WI/IN. Cheaper alternatives by half of the job: research — free (Permitio's Jurisdiction Verifier for any U.S. address; free AI permit research); execution — $25–100 per permit via Permitio for licensed contractors nationwide, corrections included. ## Permit Expeditor vs Permit Software permitio.ai/blog/permit-expeditor-vs-permit-software Traditional expediters are local people/firms who walk applications through specific cities ($75–300/permit or hourly; single-metro). Self-serve software speeds up your team but keeps the filing in-house. Human-backed filing services (Permitio) combine automation with a person who files — per-permit cost, nationwide coverage, no headcount. # How-to guides ## Step-by-Step Guide to Pulling a Building Permit Without an Expediter permitio.ai/blog/pull-building-permit-without-expediter You do not need a permit expediter — any licensed contractor (and in many jurisdictions the property owner) can file directly. The 7 steps: 1. **Confirm the jurisdiction** — the mailing city is not reliable; use a free lookup (verifier.permitio.ai). 2. **Look up the requirements** — permit type, forms, fee schedule, required documents (plans, load calcs, energy compliance like California's Title 24 CF-1R). First time in a city? Call the counter. 3. **Verify license and insurance standing** — departments check credentials before reading the application. 4. **Prepare the application** — complete every field from actual spec sheets; specific scope descriptions ("replace 3-ton attic split system, like-for-like, new disconnect" beats "HVAC replacement"). 5. **Submit through the correct channel** — portal (Accela most common), counter, or email; save the record number. 6. **Track the review and clear corrections** — cities rarely notify; schedule recurring status checks; fix every correction item; resubmit flagged as a resubmission. 7. **Schedule inspections and close out** — book the window, pass, confirm the permit is finaled (expired open permits resurface at home sale). DIY costs 1–4 hours per permit plus follow-up. A full-time coordinator only makes sense at many dozens of permits/month. The middle path: per-permit filing services (Permitio, $25–100/permit including corrections) — a per-permit decision, not a hiring decision. ## How to Find the Permit Jurisdiction for Any Address permitio.ai/blog/find-permit-jurisdiction-by-address Enter the address into the free Permitio Jurisdiction Verifier (verifier.permitio.ai) to get every governing authority. Why the mailing address fails: USPS mailing cities are postal fictions (most of the Las Vegas Strip is unincorporated Clark County); unincorporated county pockets sit inside metros; annexations move boundaries; special districts (school, fire, water) add fees and sign-offs. Filing with the wrong office typically costs 1–3 weeks: rejection or return, then a restart with the correct office. ## How to Track Permit Application Status Across Different City Jurisdictions permitio.ai/blog/track-permit-status-across-jurisdictions Cities rarely send notifications — an approval might trigger an email; correction requests usually do not. Keep one system of record with eight fields per permit: client & job address; jurisdiction; portal & record number; permit type; submission date; status + date last verified; next scheduled check; expected approval date from that jurisdiction's track record. Cadence: confirm intake 2–3 business days after submission; weekly during review; every 2–3 days once past the city's typical approval time — then call, by record number. Manual tracking stops scaling around ten open permits or three jurisdictions; permit tracking software (Permitio CRM) generates the check queue, flags overdue submissions, projects approvals, and puts inspections on one calendar. ## Why HVAC Permit Rejections Happen (And How to Avoid Them) permitio.ai/blog/hvac-permit-rejection-reasons Seven most common rejection causes: 1. **Filing in the wrong jurisdiction** (the #1 cause — unincorporated areas, cities that contract out their building department) 2. **Missing/incomplete equipment specifications** (model numbers, SEER2/HSPF2 ratings, refrigerant type, BTU capacity; "same as existing" is not acceptable) 3. **Incomplete or missing load calculations** (Manual J where required — when in doubt, include it) 4. **Contractor license or insurance issues** (expired/incorrect license number, lapsed certificate of insurance) 5. **Vague scope of work** (include equipment type, location, replaced vs. staying, ductwork modifications) 6. **Wrong permit type** (mechanical vs. separate electrical for a new disconnect/circuit; can trigger stop-work at inspection) 7. **Signature/notarization requirements not met** (owner signature, notarization, wet vs. electronic — varies widely by city) Fix process: read the full rejection notice; compare against the original line by line; gather missing documentation; correct the form itself, not just attachments; resubmit through the specified channel flagged as a resubmission. Resubmission usually carries no new fee if within the allowed timeframe. In high-volume cities (San Francisco, Los Angeles) a resubmission can queue as long as the original. Permits filed through Permitio: rejections are fixed and resubmitted at no additional charge. ## How to Pull an HVAC Permit in California permitio.ai/blog/how-to-pull-hvac-permit Full process from jurisdiction lookup through final inspection: Title 24 forms (CF-1R), over-the-counter vs. plan review, HERS testing, common rejections, and the exact order of operations. Related California guides cover heat pumps, furnaces, ducts, water heaters, mini-splits, EV chargers, solar, battery storage, panel upgrades, generators, and ADUs. ## Permit Tracking Software vs the Spreadsheet permitio.ai/blog/permit-tracking-software A spreadsheet records permits; it does not move them. Four failure modes: nothing chases anything; it is current exactly once; one owner is one point of failure; history evaporates. The four deadlines a tracker must watch by itself: submit windows, city status checks, expected approvals (from the jurisdiction's track record), inspections and re-inspections. Tracking also produces per-jurisdiction approval-time data that changes quoting and scheduling. Switching: CSV import into Permitio CRM — moved over in an afternoon. ## Accela Permit Filing Guide for Contractors permitio.ai/blog/accela-permit-filing-guide-contractors Accela is the government permitting platform contractors encounter most. Covers choosing the right record type, uploading documents correctly, avoiding common Accela rejections, and keeping permit status from getting buried in the portal. # Reference facts - **What is a building permit?** Official permission from a local government to build, alter, or demolish — and the paper trail that says the work meets code. (permitio.ai/blog/what-is-a-building-permit) - **Building permit cost:** Most residential building permits run $150–$2,000; fees are valuation-based and cities stack surcharges. (permitio.ai/blog/building-permit-cost) - **HVAC permit cost:** Most residential HVAC permits run $150–350; the full spread is $75 to $800 depending on jurisdiction. (permitio.ai/blog/how-much-does-hvac-permit-cost) - **Do you need a permit to replace a furnace or water heater?** In nearly every U.S. jurisdiction, yes — even like-for-like swaps. - **Permit requirements:** license, application, plans, supporting documents, fees, inspections — the exact list changes city to city. (permitio.ai/blog/building-permit-requirements) - Full guide index: permitio.ai/blog — city-specific processes (SF, Chicago, LA County, Bay Area, Seattle, Phoenix, Las Vegas, Texas metros, Atlanta, Miami-Dade), California Title 24, and trade-specific requirements.